New Construction

BEVERLY MIDDLE SCHOOL | BEVERLY, MA

Owner: City of Beverly | Beverly, MA

Architect: Ai3 Architects, LLC | Wayland, MA

Contruction Manager: Agostini-Bacon Construction | East Providence, RI

Lockheed Architectural Solutions, Inc. Project Manager: John Kroll

The Lockheed Architectural Solutions, Inc. team completed the $109 million rebuild of the Beverly Middle School, built to accommodate roughly 1,400 students, alongside Ai3 Architects and Agostini-Bacon Construction. The new building has much to offer students and faculty, including sizable windows that allow a substantial amount of natural light to illuminate the interior. The curtain wall system complements the windows perfectly, allowing ample light to pass through while blocking the sun’s heat from getting trapped inside the building.

INSTALLED COMPONENTS INCLUDED:

  • 274 EFCO Windows
  • 27,184 square feet of EFCO Curtain Wall

PROJECT HIGHLIGHTS