Renovations

CHARLESTOWN HIGH SCHOOL | CHARLESTOWN, MA

Owner: Town of Charlestown School Department, MA

Architect: CBI Consulting | Boston, MA

General Contractor: Chapman Waterproofing | Dorchester, MA

Lockheed Architectural Solutions, Inc. Project Manager: John Kroll

The multiple structures of this renovation project included a pedestrian bridge connecting the buildings, a greenhouse building, and a student-run café.

INSTALLED COMPONENTS INCLUDED:

  • 108 openings fitted with 550 Lockheed Architectural Solutions, Inc. Series 6125 Fixed and Fixed over Project-Out window units
  • All material provided in a clear anodized finish
  • Aluminum greenhouse system manufactured by Alumicor, LTD
  • Pedestrian bridge and student-run café renovated with 1″ insulated glass with a Solera colored interlayer of several colors.
  • All classroom and administration area windows provided with 1″ insulated Okalux light diffusing glass

PROJECT HIGHLIGHTS