PATRICK E. BOWE SCHOOL | CHICOPEE, MA
Owner: City of Chicopee | Chicopee, MA
Architect: Turowski 2 Architecture | Marion, MA
Construction Manager: Compass Project Management | Norwood, MA
Lockheed Architectural Solutions, Inc. Project Manager: David Ahles
The aging windows and doors at the 91-year-old Partick E. Bowe school were at least 45 years old and drafty. This project consisted of Lockheed Architectural Solutions, Inc. installing new windows and doors at the 73,520 square foot elementary school. The renovations included installing storefronts, EFCO Durastile™ Doors, Special-Lite FRP Doors, EFCO HX/FX 32 Single Hung Windows, and EFCO 325X Fixed Windows. All windows and doors were built in compliance with the MSBA’s sustainability requirements.
INSTALLED COMPONENTS INCLUDED:
- 12 EFCO 403 Series Storefronts
- 6 Pair & 3 Single EFCO D518 Durastile™ Doors
- 6 Single Special-Lite SL-20 FRP Doors
- 230 EFCO HX/FX 32 Single Hung Windows
- 24 EFCO 325X Fixed Windows