NORTON ELEMENTARY SCHOOL | CHESHIRE, CT

Owner: Town of Cheshire | Cheshire, CT

Architect: Tecton Architects

General Contractor: O&G Industries

Lockheed Architectural Solutions, Inc. provided a comprehensive exterior and interior glazing, entrance, and cladding package for the new Norton Elementary School in Cheshire, Connecticut. Working with O&G Industries, our team installed multi-level fixed windows, exterior and interior storefront systems, heavy-duty entrances with automatic operators, wall panels, insulation, and architectural soffit and trim elements.

The project also included a bullet-resistant security transaction window, helping create a safe, durable, and functional environment for students, staff, and visitors. Lockheed’s work began in September 2025 and was completed in August 2026, ahead of the school’s opening for the fall semester.

INSTALLED COMPONENTS INCLUDED:

  • EFCO FX45 Fixed 4-1/2″ Windows
  • EFCO 403T 2″ x 4-1/2″ Exterior Storefront
  • EFCO 402 2″ x 4-1/2″ Interior Storefront
  • EFCO 500T 2″ Heavy-Duty Entrances
  • ATAS International 8″ Opaline Wall Panels
  • DuPont 2″ Thermax Wall Insulation
  • Laminators Omegalite Clip-and-Caulk ACM Panel Soffits and Trims
  • CRL Bullet-Resistant Security Transaction Window

PROJECT HIGHLIGHTS