DR. ALBERT B. CONSENTINO MIDDLE SCHOOL | HAVERHILL, MA

Owner: City of Haverhill, MA | Haverhill, MA

Architect: Dore + Whittier Architects, Inc.

General Contractor: Brait Builders Corp.

Lockheed Architectural Solutions, Inc. provided a comprehensive exterior and interior glazing and entrance package for the new Dr. Albert B. Consentino Middle School in Haverhill, Massachusetts. Working with Brait Builders Corp., our team installed high-performance, triple-pane exterior windows and multi-level curtain wall systems with integrated sunshades, along with thermally efficient exterior entrances, interior storefronts, and interior entrances.

The project also included automatic door operators and a security transaction window and entrance door, helping create a secure, durable, and energy-efficient learning environment for students, faculty, and visitors. Awarded in March 2024, the project included an onsite mockup completed in December 2024. Lockheed mobilized in early April 2025 and completed work in June 2026, in preparation for the school’s September semester.

INSTALLED COMPONENTS INCLUDED:

  • EFCO 325X Triple-Pane Fixed and Awning 3-1/4″ Windows
  • EFCO 5500X 2-1/2″ x 8″ Curtain Wall with Sunshades
  • EFCO 402 2″ x 4-1/2″ Interior Storefront
  • EFCO 502 ThermaStile Exterior Entrances
  • EFCO 500 Wide Stile Interior Entrances
  • OBE Solarban 60 Triple-Pane High-Performance Glass
  • Okalux Light-Diffusing Insulated Glass
  • Total Security Solutions Security Transaction Window and Entrance Door

PROJECT HIGHLIGHTS