MANSFIELD TOWN HALL | MANSFIELD, MA

Owner: Town of Mansfield, MA

Architect: Weston & Sampson | Foxborough, M

General Contractor: Lockheed Architectural Solutions | Pascoag, RI

Construction Manager: Town of Mansfield, MA

Lockheed Architectural Solutions was selected to modernize and improve accessibility at Mansfield Town Hall by replacing both the main public entryway and the rear employee entrance. The work reflects the Town’s investment in creating welcoming, accessible civic spaces while maintaining aesthetic continuity and durability.

The project involved full removal and replacement of two key entry points:

  • Main Front Entrance + Vestibule

    • Installed two Stanley Dura-Glide 2000 automatic sliding doors
    • Integrated with Kawneer 451 UT storefront sidelites
    • Finished with Alpolic ACM panels above for a sleek, updated look
  • Rear Employee Entrance + Vestibule

    • Installed Kawneer 451 UT storefront frames with 500T Insulpour doors
    • Included Dormakaba automatic operators for ease of access
    • Equipped with ASSA ABLOY electronic hardware for ADA compliance
    • Finalized with Alpolic ACM trim and distinctive trapezoid glass transoms

INSTALLED COMPONENTS INCLUDED:

  • Sliding Entry Doors: Stanley Dura-Glide 2000
  • Swing Doors: Kawneer 451 UT / 500T Insulpour
  • Operators: Dormakaba
  • Hardware: ASSA ABLOY
  • Cladding & Trim: Alpolic ACM Panels

PROJECT HIGHLIGHTS