WAKEFIELD HIGH SCHOOL | WAKEFIELD, MA

Owner PM: LeftField
Architect: SMMA
General Contractor: Bond Building Construction Inc.

Lockheed Architectural Solutions, Inc. partnered with Bond Building Construction Inc. to deliver the glazing package for Wakefield High School. The package gives the school a bright, durable building envelope that fills the learning spaces with daylight.

Lockheed provided and installed roughly 7,880 sq. ft. of Kawneer glazing systems and glass. Our project management, engineering and field teams worked closely together from preconstruction through closeout, which kept the schedule on track. Our crews brought top-level craftsmanship and a strong safety focus to every elevation, inside and out.

The result is a modern, daylight-filled school that Wakefield students, teachers and families can be proud of for years to come.

INSTALLED COMPONENTS INCLUDED:

  • Kawneer AA4325

PROJECT HIGHLIGHTS