CHANDLER MAGNET SCHOOL | WORCESTER MA
Owner: Worcester Department of Public Works
Architect: T2 Architecture | Marion, MA
General Contractor: J.J. Cardosi | East Providence, RI
Lockheed Architectural Solutions, Inc. Project Manager: John Kroll
The project consisted of replacing 947 steel windows in 309 openings utilizing the Graham Thermal GT6200 Fixed Over Project In Window Systems. All windows were glazed with triple pane insulated glass with dual Low E coatings.
INSTALLED COMPONENTS INCLUDED:
- Graham Thermal GT6200 Fixed Over Project In Window Systems
- All windows were glazed with triple-pane insulated glass with dual Low E coatings
- All aluminum was finished in a Bone White paint finish
- Main entrance also replaced with EFCO Rugged Stile doors and 9” deep curtainwall system