Renovations

CHANDLER MAGNET SCHOOL | WORCESTER MA

Owner: Worcester Department of Public Works


Architect: T2 Architecture | Marion, MA


General Contractor: J.J. Cardosi | East Providence, RI

Lockheed Architectural Solutions, Inc. Project Manager: John Kroll

The project consisted of replacing 947 steel windows in 309 openings utilizing the Graham Thermal GT6200 Fixed Over Project In Window Systems. All windows were glazed with triple pane insulated glass with dual Low E coatings.

INSTALLED COMPONENTS INCLUDED:

  • Replacement of 947 steel windows in 309 openings utilizing the Graham Thermal GT6200 Fixed Over Project In Window Systems
  • All windows were glazed with triple-pane insulated glass with dual Low E coatings
  • All aluminum was finished in a Bone White paint finish
  • Main entrance also replaced with two sets of EFCO Rugged Stile doors and 9” deep curtainwall system

PROJECT HIGHLIGHTS