Bruce C. Bolling Municipal Building | Roxbury, MA

BRUCE C. BOLLING MUNICIPAL BUILDING | ROXBURY, MA Architect: Sasaki Associates Inc. | Watertown, MA General Contractor: Shawmut Design and Construction | Boston, MA Lockheed Architectural Solutions, Inc. Project Manager: Jacob Atteridge This renovation involved the replacement of the windows, storefront, curtainwall, wood windows, and interior office fronts of the Bruce C. Bolling Municipal Building.…

Cambridge Rindge & Latin School | Cambridge, MA

CAMBRIDGE RINDGE & LATIN SCHOOL | CAMBRIDGE, MA Owner: City of Cambridge, MA Architect: HMFH Architects | Cambridge, MA General Contractor: Consigli Construction | Milford, MA Lockheed Architectural Solutions, Inc. Project Manager: Nelson Mateus Completed in five phases over a period of three years. Lockheed Architectural Solutions, Inc. was involved in three phases of this…

Foxwoods Resort Casino | Mashantucket, CT

FOXWOODS RESORT CASINO | MASHANTUCKET, CT Owner: Mashantucket Pequot Tribal Nation Architect: A/Z Corporation | North Stonington, CT General Contractor: A/Z Corporation | North Stonington, CT Lockheed Architectural Solutions, Inc. Project Manager: Jacob Atteridge Lockheed Architectural Solutions, Inc. completed renovations of the retail space within the existing Foxwoods Resort Casino. INSTALLED COMPONENTS INCLUDED: Paragon structural…

Prospect Office Complex | Waltham, MA

PROSPECT OFFICE COMPLEX | WALTHAM, MA Architect: Spagnolo Gisness & Associates | Boston, MA Lockheed Architectural Solutions, Inc. Project Manager: John Kroll This renovation involved a professional office complex with three 7-story buildings. Lockheed Architectural Solutions, Inc. was able to successfully complete the project with no delays despite challenging work parameters and harsh winter weather.…

Chandler Magnet School | Worcester, MA

CHANDLER MAGNET SCHOOL | WORCESTER MA Owner: Worcester Department of Public Works
 Architect: T2 Architecture | Marion, MA
 General Contractor: J.J. Cardosi | East Providence, RI Lockheed Architectural Solutions, Inc. Project Manager: John Kroll The project consisted of replacing 947 steel windows in 309 openings utilizing the Graham Thermal GT6200 Fixed Over Project In Window…

Plaza On The Green Apartments | Waterbury, CT

PLAZA ON THE GREEN APARTMENTS | WATERBURY, CT Owner: SHP Management Corp.| Cumberland Foreside, ME
 Architect: RGB Architects | Providence, RI

 General Contractor: PAC Group, LLC | Harwinton, CT Lockheed Architectural Solutions, Inc. Project Manager: Jacob Atteridge This project was a window and storefront replacement in an occupied housing complex in the city of Waterbury,…

Josephine Towers | Waterbury, CT

JOSEPHINE TOWERS | WATERBURY, CT Owner: SHP Management Corp. | Cumberland Foreside, ME

 Architect: RGB Architects | Providence, RI

 General Constractor: PAC Group, LLC | Harwinton, CT Lockheed Architectural Solutions, Inc. Project Manager: Jacob Atteridge This renovation involved the replacement of the window and door units at Josephine Towers, one of several apartment complexes for…

Southeastern Regional Vocational Technical High School | South Easton, MA

SOUTHEASTERN REGIONAL VOCATIONAL TECHNICAL HIGH SCHOOL | SOUTH EASTON, MA Owner: Town of South Easton, MA

 Architect: Drummey Rosane Anderson, Inc. | Waltham, MA General Constractor: W.T. Rich Company | Newton, MA This multifaceted project included the construction of a new gymnasium, a minor addition, and renovations to an existing building. The gymnasium construction required…

Belair Towers | Brockton, MA

BELAIR TOWERS | BROCKTON, MA Owner: Brockton Housing Authority Architect: McKinnell, McKinnell & Taylor | Norwood, MA General Contractor: Lockheed Architectural Solutions, Inc. | Pascoag, RI Lockheed Architectural Solutions, Inc. Project Manager: John Kroll This renovation project involved the replacement of windows and sliding doors for 280 units in this 10-story high-rise residential housing complex. INSTALLED…

Charlestown High School | Charlestown, MA

CHARLESTOWN HIGH SCHOOL | CHARLESTOWN, MA Owner: Town of Charlestown School Department, MA Architect: CBI Consulting | Boston, MA General Contractor: Chapman Waterproofing | Dorchester, MA Lockheed Architectural Solutions, Inc. Project Manager: John Kroll The multiple structures of this renovation project included a pedestrian bridge connecting the buildings, a greenhouse building, and a student-run café.…